Serik - Alanya Highway Project
expected to greatly alleviate the transportation burden of Antalya region Serik - Alanya Highway Projectattention to both the technical capacity and the rapidly moving process. One of the most important stages of the project Non-slip - 1500 meters double-way tunnel between the brainIt continues to be opened with intensive work in the region and is reported that the project is transmitted in accordance with the planned dates of the general.
Starting from Serik, working on the road from Alanya to Alanya is not limited to tunnels. Project; Serik, Tdownl, Manavgat, Manavgat East, Alarahan, Konaklı and Alanya West 7 different roast capping. All of these intersections will contribute to regional traffic is carefully planned to turn the highway into a seamless transportation line.
Giant Structures in Highway Faller
Project scope 4.365 meters long 5 tunnelTags 5.966 meters 16 viyaduk and 4 motorway service facility built. Especially when the region is considered geological structure, these tunnels and viyaducs are critical to engineering. These structures, which will increase both driving safety and significantly shorten the passenger, aim to carry the transportation quality at the east-west island of Antalya to the top level.
A New Period For Speed, Comfort and Security
The design speed of the motorway along the main road 140 kmif in connection roads 110 km planned. This speed standard aims to offer both comfortable and safer travel. Travel lengths will be shortened with the expected project to significantly reduce the concentrated tourism traffic in the summer, a more stress-free transportation for the territory people and tourists will be provided.
AHB MEDIA FOR WHATSAPP CHANNELDOWNLOAD